The Anime Trip
🌐 EN ▾
ItalianoEnglish繁體中文(台灣)繁體中文(香港)日本語
PLAN YOUR TRIPMy tripSign in / Sign upSign in / Sign up

Toyama

Kurobe Gorge Railway

黒部峡谷鉄道(トロッコ電車)

Open on the mapwith over 1,800 wonders of Japan

Kurobe Gorge Railway
photo by 掬茶 · CC BY-SA 4.0
Kurobe Gorge Railway
photo by Tochigi Lemon Milk · CC BY 4.0

Built for the hydroelectric works, it runs through 20 km of gorge on rails 76 cm apart.

Built to carry materials to the hydroelectric construction sites on the Kurobe River, the narrow-gauge line (762 mm) opened to the public in 1953 and runs 20.1 kilometres between Unazuki and Keyakidaira, inside a V-shaped gorge between walls that in places come close to a kilometre deep. The route, moved by 1.8 km in 1988 to make way for another dam, goes through dozens of tunnels and over bridges suspended above the torrent, including the new Yamabiko Bridge.

Small open sightseeing train (with open-top carriages in the warm season) that runs up the Kurobe River gorge from Unazuki Station, the direct heir of the construction railway built for the area's hydroelectric development.

ℹ️ Season roughly from mid-April to late November; fares are banded by arrival station (Kanetsuri, Kuronagi, Keyakidaira). Open carriages in summer, closed ones (at an extra charge) in the colder seasons. Check times and fares on the official site before setting off.

🚉 Unazukionsen · 2 min walk

Holidays in Japan? Plan them with us.Over 2,000 real places, a day-by-day itinerary.FreeOpen the map →

Sources: ja.wikipedia.org

Nearby

All series · Open the map

Kurobe Gorge Railway
Open on the mapwith over 1,800 wonders of Japan
Kurobe Gorge Railway
photo by 掬茶 · CC BY-SA 4.0
Kurobe Gorge Railway
photo by Tochigi Lemon Milk · CC BY 4.0

Built for the hydroelectric works, it runs through 20 km of gorge on rails 76 cm apart.

Built to carry materials to the hydroelectric construction sites on the Kurobe River, the narrow-gauge line (762 mm) opened to the public in 1953 and runs 20.1 kilometres between Unazuki and Keyakidaira, inside a V-shaped gorge between walls that in places come close to a kilometre deep. The route, moved by 1.8 km in 1988 to make way for another dam, goes through dozens of tunnels and over bridges suspended above the torrent, including the new Yamabiko Bridge.

Small open sightseeing train (with open-top carriages in the warm season) that runs up the Kurobe River gorge from Unazuki Station, the direct heir of the construction railway built for the area's hydroelectric development.

ℹ️ Season roughly from mid-April to late November; fares are banded by arrival station (Kanetsuri, Kuronagi, Keyakidaira). Open carriages in summer, closed ones (at an extra charge) in the colder seasons. Check times and fares on the official site before setting off.

🚉 Unazukionsen · 2 min walk

Holidays in Japan? Plan them with us.Over 2,000 real places, a day-by-day itinerary.FreeOpen the map →

Sources: ja.wikipedia.org

Nearby